Paving Checklist

Pavings Checklist

Excavation

m3 or m2

Disposal

  • On-site
  • off-site

System of disposal

  • Skip
  • Grab
  • Self-transported
  • Self-loaded 20 tonne loads by larger excavators

Base

  • Material
  • Thickness
  • Reinforcement

Delivery type

  • Bagged aggregates
  • Small loads
  • Full loads (20 t)

Edging if appropriate

  • Excavation for edging
  • Base to Edging
  • Edging surface

Paving Surface

  • Material
  • Bedding
  • Expansion joints if appropriate
  • Haunching
  • Jointing