Walls Checklist
We recommend checking your walls with an engineer
Excavation - m² or m³
Disposal – On-site or off-site
Footing Width x thickness x length = m³
Construction method
Brick
Block
Hollow block + concrete fill
In-situ Concrete
Projections if the wall requires additions strength
Piers
Facing
Render
Stone
Snap header brick
For Retaining walls include: -
Larger footings
Toe (if appropriate but in conjunction with an engineer)
Water proofing to the rear of the wall – usually bitumen based
Weepholes
Drainage trench -shingle backfilled with perforated pipe
Drainage board in heavier soils
Drainage to the rear of the wall
Coping
Other factors affecting price are
Delivery loads (Bags or Bulk or Loose)
Hand or machine excavation
Disposal by skip/grab or on-site