Water Feature Checklist
Water Feature Check list - Formal Features - Sunken
Excavation to required depth allowing for 200 base- 50 blinding +150 concrete
Grading to levels
Blinding
Reinforced concrete base
Footings for side walls
Side walls of retaining blockwork or in-situ concrete
Render
GRP waterproofing or
Sandwich liner water proofing
Pump housing sump
Lighting chases and lighting recesses
Facing stone/ tiles/ render/ or pebbles etc. (if GRP is not the finished surface)
Trenching for cables and water supply
Electrical supply and cable entry
Water supply
Water outlets if not circulatory system
Water reservoir
Fountain
Spillway furniture (stone metal or other)
Filter
Lights
Top-up
Overflow
Edging
Water Feature Check list - Formal Features – Above ground
Excavation to required depth allowing for 200 base- 50 blinding +150 concrete
Grading to levels
Blinding
Reinforced concrete base
Footings for side walls
Side walls of retaining blockwork brickwork or in-situ concrete
Render
GRP waterproofing or
Sandwich liner water proofing
Pump housing sump
Lighting chases and lighting recesses
Facing stone internal/ tiles/ render/ or pebbles etc. (if GRP is not the finished surface)
Facing external
Trenching for cables and water supply
Electrical supply and cable entry
Water supply
Water outlets if not circulatory system
Water reservoir
Fountain
Spillway furniture (stone metal or other)
Filter
Lights
Top-up
Overflow
Coping